Stained by algae or not, roofs are cleaned using any of three common methods, each of which has its own set of pros and cons. These methods are, pressure washing, and the application of solutions containing either, chlorine bleach or sodium hydroxide. When performed correctly and only once, these techniques clean roofs effectively without significant adverse effects. The problem is, they usually have to be repeated every six to 18 months to maintain cleanliness.

Chlorine Solution Washes: Chlorine bleach solution application requires a lot less rinsing than the two other methods, thereby allowing a cleaning procedure of shorter duration. One good consequence of a quicker process is less wear and tear for the roof. However, chlorine can be toxic to some people and plants, so care should be exercised to protect employees or residents, as well as the property itself, from spray runoffs. Asphalt shingle roofs are particularly well adapted to this type of cleaning.

Sodium Hydroxide-Based Cleaning: This type of roof cleaning method can be very effective at degreasing roofs. However, this cleaning method takes a much longer time than chlorine bleach washing because the sodium hydroxide needs to be thoroughly rinsed. As a consequence, a roof becomes more at risk for being damaged. A force of 100 psi is enough to wash away the cleaning solution on asphalt shingle roofs, but the force is enough to cause some asphalt granules to get washed away during the rinsing process. Advertisements claim that sodium hydroxide is safe to use, but it can actually be toxic. Thus, make sure that the solution does not run off or come into contact with people, plants and anything in the surrounding area during the application and rinsing process. In addition, sodium hydroxide is corrosive so any residues left can damage the roof, particularly those that are made of asphalt shingles.

Pressure Washing: If you have a concrete, barrel tile or metal roof, you can clean it by power washing. Power washing does not involve the use of chemicals, which makes power washing an environment-friendly method of roof cleaning. However, power washing is rather time consuming and can put more strain on the roof. If you have coated roof tiles, the thin layer of coloring can be easily washed away by power washing. If you have a concrete roof, power washing will bring out the concrete's natural gray color, and this could mean that you will have to paint or stain the roof afterwards.


How To Clean Your Roof - The Right Way

Promo Microderm Machines

Tuesday, January 10, 2012

How To Make Your Own Sidewalks

!±8± How To Make Your Own Sidewalks

Making a sidewalk is a lot easier than people think. It's also a lot cheaper to do all your own labor. First we need to decide how wide we want to make it and how long. We also need to know how deep into the ground we want to dig.

It's much easier if you don't have to dig very deep at all when starting a sidewalk, but this depends on your building site. For instance, if you're putting in a new sidewalk before you dump the top soil for a new lawn then you will want to keep the sidewalk on top of the ground. If you are setting the sidewalk into an existing lawn or walk area, then you will need to dig down an inch or two so the sidewalk isn't too high. Sidewalks that are too high are tripping hazards because they stick up too far.

Let's say our sidewalk is going to be four feet wide and thirty feet long. This will be a sidewalk where we'll need to dig into the ground exactly two inches. We need to measure across the sidewalk area which we already know is forty-eight inches, but we also need to dig the extra area where the forms will go. The forms for sidewalks are often just 2x4 studs. They are cheap and really easy to work with.

The measurement across the sidewalk will include the thickness of a 2X4 stud on each side. The thickness of each stud is an inch and a half, so add 3 inches onto the width of the sidewalk. This will give us an area of 51 inches to dig. Of course, we can always dig a much wider area and just backfill the dirt once the sidewalk is done.

The excavated area will be 51 inches wide by thirty feet long. Sidewalks are usually dug out with a shovel because of the shallow depth. You will need to make sure the entire area is level and you may need to tamp the dirt where the cement will be poured. At this point we can start setting in the forms. The best way to join two 2X4 studs is by nailing a 2X4 block on the outside of the forms where the joint is. This will keep them secure. Next, make sure the forms are even with a consistent measurement of 48 inches the entire length.

You won't need to use rebar like you do when pouring foundations. If you're making a small sidewalk, then you can buy bags of ready mix, add water and pour it in, but for most projects, you will want to call the cement company to deliver and pour the cement. The cement needed for sidewalks is a smoother type of cement than foundations. Foundation cement is called "5-bag mix, but sidewalk cement is "six-bag mix. It has a higher cement content and uses smaller aggregate material.

The cement company will know what to do when you tell them the cement is for a sidewalk. They will ask you for the dimensions of your project and they will calculate the amount of cement needed. Cement is calculated and sold by square yards. Let's take our measurement as an example. Our sidewalk is thirty feet long, four feet wide, and four inches deep. So our square footage is 120 square feet by four inches deep. Let's convert this to square yards by dividing 120 by 27. There are 27 cubic feet in a square yard. This gives us 4.44 square yards, but we still have to divide that by 3 because the sidewalk isn't a foot thick, it is only four inches, which is a third of a foot. So our final number is about one and a half yards of cement needed to pour the sidewalk. The price of cement varies by location, but if you live fairly close, you should be able to get it for around per yard.

Now, we're ready to pour the sidewalk. The cement truck will pour the cement, but you will need to shovel it around to get it even against the forms. You will need to get the cement evenly into the forms. Jab the cement constantly to break any air bubbles. Once the cement is where you want it, you will need to make it smooth. You can buy a screed or you can just use a level 2X4 to run across the top of the cement. This will make it basically smooth.

Once you have the surface fairly smooth, you will need to use a float or a long trowel to bring the fine cement to the surface. This will make a very smooth surface and will make the rougher aggregate material sink beneath the surface. You will want let this dry for a few hours before brushing the surface with a shop broom. Brushing will give the sidewalk some traction so you don't slip on the smooth surface. Be careful not to overdo the brushing.

After about three days, you can remove the forms and start to back fill the edges of the sidewalk so they are even with the lawn or ground. Ideally, we like to have the side walk about a half inch higher than the lawn.

For the final step in the sidewalk process, we need to cut sections in the concrete so it doesn't crack with the movement of the ground underneath. You can rent a concrete cutter or use a concrete blade on a circular saw and cut across the sidewalk every ten feet or so. This will give the sidewalk flexibility during expansion and contraction of the soil.

That's basically how to make your own sidewalks. We can usually save about two-thirds the cost of a professionally poured sidewalk by doing it ourselves.


How To Make Your Own Sidewalks